Primary conductor (before transformer) requires minimum trench depth of 36 inches and installation of CVEC provided continuous conduit. Member/member’s contractor is responsible for pickup and return of reel from determined CVEC warehouse location.
Secondary conductor (after the transformer) requires minimum trench depth of 30 inches and member is to provide and install 3 inches schedule 40 electrically rated conduit for the entire length of route.
Exception: VDOT mandates underground state road crossings be installed by method of directional boring. Boring will be provided by CVEC bonded contractor at member’s expense.