As part of the design process a staking technician will conduct a site visit. During the site visit, Staking Tech will layout proposed design in field and gather GPS data for mapping purposes. Locations of proposed structures will be marked with wooden stakes wrapped with white surveying ribbon. Underground conductor route will be marked with white pin flags. Note: Pre-scheduled appointments with Staking Tech are available.

Prior to scheduling site visit:

Building envelope should be cleared, 4 corners of proposed structure should be marked in field, and construction entrance installed. If site is found to be unsuitable for design a $200 re-engineering fee will be required before return trip is made.

Upon completion of site survey:

Member will be issued a cost letter outlining all aide to construction to be paid by the member, a sketch of the proposed route, necessary easement documentation, and any other job-specific documentation required (i.e. large power contract, ag exempt form). Once paperwork has been signed and sent back to CVEC any member requested changes requiring an additional site visit will be accessed a $200 re-engineering fee.